When sourcing textiles on Alibaba.com, two attributes dominate early-stage buyer decisions: Minimum Order Quantity (MOQ) and Delivery Time. For Southeast Asian merchants exploring small batch procurement, the combination of MOQ: 100 Pieces and Delivery Time: 15 Days represents an attractive entry point—but understanding what this configuration really means requires diving into industry realities.
What is MOQ? Minimum Order Quantity is the smallest number of units a manufacturer will produce in a single order. In textile manufacturing, MOQ varies dramatically based on product type, customization level, and factory capacity. Common ranges include:
- Basic T-shirts: 50-200 pieces
- Hoodies/Sweatshirts: 100-300 pieces
- Jeans/Denim: 200-500 pieces
- Custom woven fabrics: 500-1000+ meters
MOQ 100 pieces sits at the lower end of the spectrum, making it accessible for startups and market testing, but it comes with specific trade-offs.
What Does Delivery Time Include? Production lead time encompasses multiple stages:
- Fabric sourcing (if not in stock)
- Pattern making and sampling
- Cutting and sewing
- Quality control and finishing
- Packaging and shipping preparation
A 15-day delivery承诺 typically means the factory has fabric in stock and your design requires minimal customization. For truly custom orders with new fabric development, industry benchmarks suggest 6-8 weeks for small batches (100-300 units) is more realistic [2].

